===Concrete===
===Concrete===
Concrete runway requires 265,354 MT of grade C material to build the runway 4 feet deep.  Ideally you would build the airport adjacent to an established mining operation and transfer the materials over!
Concrete runway requires 66,339 MT of grade C material to build the runway 1 feet deep.  Ideally you would build the airport adjacent to an established mining operation and transfer the materials over!


===See Also===
===See Also===

Revision as of 17:04, 17 August 2020

 This article is about the airfield colony type runway expansion. For the airport diagram in Deois, see ATC.

A colony runway is approximately 6500 feet long and 150 feet wide (length varies depending on location).

Marston Matting Runway

This portable temporary surface-based solution requires 78,000 interconnected mats weighing approximately 30 kg each for a total amount of 2,123 MT of fabricated material required.

Concrete

Concrete runway requires 66,339 MT of grade C material to build the runway 1 feet deep. Ideally you would build the airport adjacent to an established mining operation and transfer the materials over!

See Also

Runway Lights