Category

Airfield: Difference between revisions

From Rise: The Vieneo Province

Line 5: Line 5:


===Expansions===
===Expansions===
Next step requires 170,000 MT of grade C material to build the runway
[https://en.wikipedia.org/wiki/Marston_Mat Marston Matting Runway] requires 52000 mats weighting 30Kg each. For a total in Fab of 1560 MT
Concrete runway requires 170,000 MT of grade C material to build the runway
  Ideally you would build the airport adjacent to an established mining operation and transfer the materials over
  Ideally you would build the airport adjacent to an established mining operation and transfer the materials over



Revision as of 22:06, 13 June 2019

Outfitting

Outfit cost is 69990 CR and requires one (1) colonist for construction

Initial construction is just the FBO (Fixed Base Operator) building

Expansions

Marston Matting Runway requires 52000 mats weighting 30Kg each. For a total in Fab of 1560 MT Concrete runway requires 170,000 MT of grade C material to build the runway

Ideally you would build the airport adjacent to an established mining operation and transfer the materials over

Runway is approximately 6500 feet long and 100 feet wide (varies depending on location)

Pages in category "Airfield"

The following 12 pages are in this category, out of 12 total.